factory
 
 
PROVIDE PROFESSIONAL STEEL BRIDGE SOLUTIONS
We are an Integrated enterprise of industry and trade
You are here: Home » News » Is the 200-Type Bailey Steel Bridge the Pinnacle of New Era Modular Bridge Technology?

Is the 200-Type Bailey Steel Bridge the Pinnacle of New Era Modular Bridge Technology?

Views: 180     Author: Site Editor     Publish Time: 2025-06-19      Origin: Site

Inquire

wechat sharing button
line sharing button
twitter sharing button
facebook sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Content Menu

>> 1. Military quality, a model for civilian use

>> 2. Six core advantages

>> 3. Full scenario application

>> 4. Successful cases of hydropower stations in Africa

>> 5. Intelligent Upgrade, Leading the Future

In the field of bridge engineering, an innovative solution is redefining industry standards - the 200 type Bailey steel bridge . As an upgraded version of the traditional 321 model, does it truly represent the highest level of modular bridge technology? Let's explore the truth!

1. Military quality, a model for civilian use

The 200 type Bailey steel bridge inherits the excellent genes of the classic Bailey bridge from World War II, and has been comprehensively upgraded to meet the engineering needs of the 21st century

Using high-strength alloy steel material, the bearing capacity is increased by 40%

The design lifespan has been extended to 50 years, far exceeding traditional bridges

Higher modularity and stronger adaptability

2. Six core advantages

Super strong load capacity

The maximum load capacity of a single span is up to 80 tons, making it easy to meet the transportation needs of modern heavy equipment

Lightning response speed

A professional team can complete the installation of a 50 meter bridge in 6 hours, which is 10 times faster than traditional methods

Intelligent monitoring system

Optional IoT real-time monitoring to keep track of bridge health status at any time

Green and environmentally friendly

100% recyclable steel, zero pollution during construction process

Economically efficient

The overall cost is only one-third of that of a concrete bridge

Globally applicable

Compliant with international standards such as ISO and ASTM

200型贝雷钢桥

3. Full scenario application

Emergency rescue

72 hour rapid establishment of life passage, once created a rescue miracle in earthquake stricken areas

Engineering construction

Temporary access roads such as hydropower stations and mines are preferred to solve transportation difficulties in complex terrains

Military field

Still the standard equipment for rapid mobile deployment of multinational armies

Tourism Development

The ideal choice for the construction of scenic area boardwalks and viewing platforms

4. Successful cases of hydropower stations in Africa

In 2023, in a hydroelectric power project in Africa:

Complete the traditional 3-month bridge construction in just 3 days

Save customers $2 million in costs

Up to now, it has operated safely without any accidents

The local engineer exclaimed, "This is as simple as building blocks

5. Intelligent Upgrade, Leading the Future

The new generation 200 model has been equipped with:

5G remote monitoring system

• Self repairing anti-corrosion coating

• Quick locking connection device

Conclusion

The strength of the 200 type Bailey steel bridge proves:

Widely used in over 100 countries

Verification of over 10000 successful cases

It is not only the pinnacle of modular bridges, but also the intelligent choice for future infrastructure!

Content Menu
We provide a well developed one-stop service system to meet customers' needs in procurement, logistics, technical support and more.

CONTACT US

Phone:+86-177-1791-8217
Email: sales@greatwallgroup.net
WhatsApp:+86-186-5284-6913
Add:10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China

QUICK LINKS

PRODUCTS CATEGORY

KEEP IN TOUCH WITH US
Copyright © 2024 Evercross bridge.All Rights Reserved.