factory
 
 
PROVIDE PROFESSIONAL STEEL BRIDGE SOLUTIONS
We are an Integrated enterprise of industry and trade
You are here: Home » News » The representative of our company's bridge hardcore technology

The representative of our company's bridge hardcore technology

Views: 224     Author: Site Editor     Publish Time: 2025-06-27      Origin: Site

Inquire

wechat sharing button
line sharing button
twitter sharing button
facebook sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

When traditional bridges collapse in extreme weather, our structure passes the wind resistance test of 200km/hour and the earthquake resistance test of 9 degrees;

This is not a miracle, but a hard-hitting answer to the company's 20 years of technological accumulation.”Corrosion-resistant steel technology: adopts the patented "nano aluminum infiltration + micro arc oxidation" composite coating (attached material inspection report), corrosion resistance life of 50 years (industry average 15 years), the corrosion rate of a certain coastal project measured 0.003 mm / year.

Lightweight structure:

the first "cellular sandwich steel plate" reduces weight by 40% under the same load, and saves 820 tons of steel in the case of bridges across the river.

Structural design

Topology optimization algorithm: "Dynamic load adaptive structure system" based on ANSYS Workbench development, realizing stress distribution uniformity improvement of 65%.

Modular connection: "magnetic fast installation node," 8 workers complete 80-meter bridge assembly in 3 hours (traditional process takes 7 days).

Manufacturing process

Laser intelligent welding: German KUKA robot + self-developed welding path algorithm, 99.97% qualified weld rate (industry average 92%), high-speed rail project won the "Lu Ban Award".

3D printing reinforcement: metal powder bed melting technology printing bridge supports, compressive strength up to 1200MPa, mine bridge case reduces on-site welding amount by 70%.

Intelligent monitoring system

Multi-source data fusion: integrates 12 types of sensors, including strain, vibration, temperature, humidity, displacement, etc., with data acquisition frequency up to 100 Hz (industry average 10 Hz).

Digital twin platform: 1:1 virtual bridge real-time mapping, fault warning 72 hours in advance.

Extreme environment testing

Typhoon test: At the Zhejiang Zhoushan Typhoon Test Field, it successfully resisted the combined load of a 17-level typhoon (wind speed of 48m/s) + 12m wave height.

Freeze-thaw test: 300 cycles of -40°C to 80°C without cracking of welds (compared with traditional bridge data on freeze-thaw deformation).

Authoritative certification

China Steel Structure Association "Gold Award Project"

American AISC certification (only 3 Chinese suppliers in the world)

International Association of Bridge and Structural Engineering (IABSE) "Innovative Technology Award"

Content Menu
We provide a well developed one-stop service system to meet customers' needs in procurement, logistics, technical support and more.

CONTACT US

Phone:+86-177-1791-8217
Email: greatwallgroup@foxmail.com
WhatsApp:+86-177-1791-8217
Add:10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China

QUICK LINKS

PRODUCTS CATEGORY

KEEP IN TOUCH WITH US
Copyright © 2024 Evercross bridge.All Rights Reserved.