factory
 
 
PROVIDE PROFESSIONAL STEEL BRIDGE SOLUTIONS
We are an Integrated enterprise of industry and trade
You are here: Home » News
Latest News
June 27, 2025

When traditional bridges collapse in extreme weather, our structure passes the wind resistance test of 200km/hour and the earthquake resistance test of 9 degrees;This is not a miracle, but a hard-hitting answer to the company's 20 years of technological accumulation.”Corrosion-resistant steel techno

June 26, 2025

In the field of bridge engineering, life is not only a time scale, but also a double promise of safety and economy. Due to fatigue cracking, corrosion failure, and other problems, the actual service life of traditional steel bridge structures is often lower than the design expectation of 17. Through

Our Main Products
We provide a well developed one-stop service system to meet customers' needs in procurement, logistics, technical support and more.

CONTACT US

Phone:+86-177-1791-8217
Email: greatwallgroup@foxmail.com
WhatsApp:+86-177-1791-8217
Add:10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China

QUICK LINKS

PRODUCTS CATEGORY

KEEP IN TOUCH WITH US
Copyright © 2024 Evercross bridge.All Rights Reserved.