Views: 260 Author: Site Editor Publish Time: 2024-10-28 Origin: Site
Content Menu
I. An Innovative Prefabricated Steel Bridge
III. Design and Craftsmanship Features
V. Quality and Service of the Manufacturer
In the long journey of engineering construction, bridges have always been an essential part. The HD200 temporary construction Bailey bridge, a masterpiece of Great Wall Group, with its outstanding quality and powerful functions, has opened a new journey in engineering construction.
The HD200 temporary construction Bailey bridge is an innovative prefabricated steel bridge. Its design inspiration comes from a deep understanding of the actual needs of engineering and the continuous pursuit of advanced technology. The appearance of this steel bridge is simple and elegant, with a compact and reasonable structure, having a modern feel while also being stable and solid.
In terms of parameters, the truss height of the HD200 temporary construction Bailey bridge is 2.134 meters, which provides sufficient stability and bearing capacity for the bridge. The length can be customized according to the needs of different projects, whether it is a small project or a large one, an appropriate solution can be found. The width can be adjusted according to traffic flow and usage scenarios, meeting various practical needs. In terms of bearing capacity, it can adapt to various load designs, ensuring safety and reliability under different usage conditions.
HD200-Type Bailey Bridge | |
Model Alias | HD200, CB200, ZB200, LSB |
Single lane | Bridge deck net width 3.15M, |
Extra Width Single lane | Bridge deck net width 4.2M, |
Std. Double lanes | Bridge deck net width 7.35M, |
Panel Dimension | 3048MM×2134MM (Holes center distance) |
The advantages of the HD200 temporary construction Bailey bridge lie in its unique design and exquisite craftsmanship. It adopts a design where the joints between the strengthened chords and the joints among the trusses are staggered, effectively reducing the inelastic deformation caused by the pin hole clearance and improving the overall performance of the bridge. The pre-camber design method enables the bridge to distribute stress more evenly when bearing loads, reducing the risk of local deformation. The guide sleeve positioning and fixing design for bolted connections ensures the accuracy and reliability of the connection and extends the service life of the bolts. The integral design of the wind-resistant tie rod and its connection with the crossbeam enhances the wind stability of the bridge, enabling it to remain safe in adverse weather conditions. The bridging and fixing of the horizontal support frame and the truss panel ensures the stability of the entire bridge and prevent lateral bending.
In terms of application range, the HD200 temporary construction Bailey bridge has wide applicability. In highway construction, it can be used as a temporary bridge to provide convenience for construction and accelerate the progress of the project; it can also be used as a permanent bridge to provide long-term traffic guarantee. In railway construction, it can cross complex terrains and provide a safe passage for railway transportation. In municipal engineering, it can be used for the construction of pedestrian overpasses, underpasses, etc., adding new highlights to urban development.
Great Wall Group, as a well-known bridge manufacturer, has always regarded quality as life and innovation as motivation. The company owns advanced production technology and a strict quality control system, ensuring that each HD200 temporary construction Bailey bridge meets high-quality requirements. At the same time, the company also focuses on customer service, providing customers with comprehensive technical support and solutions, allowing customers to have no worries during use.
In conclusion, the HD200 temporary construction Bailey bridge is a bridge product with outstanding performance and wide application prospects. It, with its innovative design, exquisite craftsmanship, and reliable quality, has brought new opportunities and challenges to engineering construction. Choosing the HD200 temporary construction Bailey bridge means embarking on a new journey in engineering construction. Let us look forward to its playing a more important role in future engineering construction.