factory
 
 
PROVIDE PROFESSIONAL STEEL BRIDGE SOLUTIONS
We are an Integrated enterprise of industry and trade
You are here: Home » News » Speedway - Our event steel bridge, completed in 8 hours, reduces construction time by 90%!

Speedway - Our event steel bridge, completed in 8 hours, reduces construction time by 90%!

Views: 221     Author: Site Editor     Publish Time: 2025-06-25      Origin: Site

Inquire

wechat sharing button
line sharing button
twitter sharing button
facebook sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Content Menu

Core selling points:

Three major core technologies

Lightning connection process

Why choose us?

Core selling points:

1. Modular prefabricated design: all components are prefabricated in the factory, and only "assembly" work is needed on-site.

2.Revolutionary quick installation system: patented connection technology, single module installation time <5 minutes

3. All-weather construction capability: special process ensures normal operation on rainy days and at night

4. Zero maintenance cycle: no need to wait for the concrete to harden and other traditional processes before opening to traffic.

Three major core technologies

Intelligent module system

Pre-installed 90% connectors

Automatic error compensation design

QR code to track installation progress

Lightning connection process

Non-welding bolt assembly (shear strength ≥ welding)

Self-aligning guide pin Torque visualization nut

All-terrain adaptability plan

Adjustable leg system (adapts to a height difference of ±30cm)

Quick-drying base mat (2-hour bearing capacity meets standards) Nighttime reflective positioning system.

Why choose us?

200+ hours of rapid construction case verification

Provide construction period insurance (delay compensation)

7×24 hour emergency response team

Content Menu
We provide a well developed one-stop service system to meet customers' needs in procurement, logistics, technical support and more.

CONTACT US

Phone:+86-177-1791-8217
Email: greatwallgroup@foxmail.com
WhatsApp:+86-177-1791-8217
Add:10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China

QUICK LINKS

PRODUCTS CATEGORY

KEEP IN TOUCH WITH US
Copyright © 2024 Evercross bridge.All Rights Reserved.