Views: 221 Author: Site Editor Publish Time: 2025-06-25 Origin: Site
Content Menu
● Three major core technologies
● Lightning connection process
1. Modular prefabricated design: all components are prefabricated in the factory, and only "assembly" work is needed on-site.
2.Revolutionary quick installation system: patented connection technology, single module installation time <5 minutes
3. All-weather construction capability: special process ensures normal operation on rainy days and at night
4. Zero maintenance cycle: no need to wait for the concrete to harden and other traditional processes before opening to traffic.
Intelligent module system
Pre-installed 90% connectors
Automatic error compensation design
QR code to track installation progress
Non-welding bolt assembly (shear strength ≥ welding)
Self-aligning guide pin Torque visualization nut
All-terrain adaptability plan
Adjustable leg system (adapts to a height difference of ±30cm)
Quick-drying base mat (2-hour bearing capacity meets standards) Nighttime reflective positioning system.
200+ hours of rapid construction case verification
Provide construction period insurance (delay compensation)
7×24 hour emergency response team