Race Against Time, Mission Must Be Achieved: Build A First-class Steel Structure Event Bridge Rapid Delivery Expert in The Industry!

Views: 221     Author: Site Editor     Publish Time: 2025-06-18      Origin: Site

Inquire

wechat sharing button
line sharing button
twitter sharing button
facebook sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Content Menu

Why is "short construction time" crucial for an event bridge project?

>> Maximize economic benefits:

>> Minimize social impact:

>> Improved project controllability:

How can we achieve the "ultra-short" construction period of the steel structure movable bridge?

>> 1. Deep prefabrication and modular design (to lay the foundation for speeding up construction):

>> 2. Intelligent construction and advanced technology (on-site efficiency multiplier): high-precision BIM technology as a full-course escort:

>> 3. Lean Project Management and Seamless Collaboration (Opening the Fast Track to Delivery):

>> 4. Strictly control the debugging and acceptance process (ensure success in one go):


In the arena of infrastructure construction, time is efficiency, and speed is competitiveness. For the steel structure movable bridge project, the long construction cycle not only means high capital occupancy costs and continuous traffic / channel disruption, but may also miss development opportunities. We deeply understand your urgent need for rapid delivery, and as a driving force, we will build "short construction time" as the core advantage of our steel structure movable bridge products to help you take the lead!

Why is "short construction time" crucial for an event bridge project?

Maximize economic benefits:

shorten the construction period to directly reduce loan interest and indirect costs such as project management, and accelerate the return on investment.

Minimize social impact:

Minimize the interference time of existing traffic and shipping, alleviate public pressure, and improve social satisfaction.

Risk Control Enhancement: Reduce on-site open-air operation time and reduce the risk of encountering bad weather and unexpected events.

Improved project controllability:

more accurate project schedule prediction and faster turnover, improving the overall project management efficiency.

Responding to urgent needs: In scenarios such as post-disaster reconstruction and emergency channel construction, the ability to deliver quickly is the lifeline.

How can we achieve the "ultra-short" construction period of the steel structure movable bridge?

We do not rely on simple "rush work", but through systematic innovation, exquisite craftsmanship and efficient collaboration, we fundamentally compress the key path time, ensuring that speed and quality are equally important:

1. Deep prefabrication and modular design (to lay the foundation for speeding up construction):

design considers manufacturing and installation: our design team integrates "rapid construction" into the genes from the very beginning. The use of highly standardized and modular steel structure design enables components to be prefabricated efficiently, in bulk, and of high quality in the factory.

Maximize the proportion of factory operations: complex welding, node processing, Key, time-consuming processes such as anti-corrosion coating (even some mechanical pre-assembly) are strictly controlled in modern factories with excellent environment and stable processes, unaffected by weather, with controllable quality and efficiency far exceeding on-site operations.

Large-scale module transportation and lifting: The bridge structure is decomposed into giant prefabricated modules that are as large as possible and within the transportation and lifting capacity. Only precise positioning and efficient connection are required on site, which greatly reduces welding work in high-altitude or water environments. The construction time is compressed to an extreme limit;

2. Intelligent construction and advanced technology (on-site efficiency multiplier): high-precision BIM technology as a full-course escort:

use building information modeling to simulate the entire process and accurately guide factory prefabrication and on-site installation. Achieve "zero collision" construction to avoid rework and delays. Automation and intelligent welding applications: Automated welding robots and advanced welding techniques are widely used in factories and on-site conditions to ensure the quality of welds and significantly improve connection speed. Innovative connection technology: Promote the use of high-strength bolt connections, innovative pin/hinge joints, and other fast and reliable connection methods to reduce on-site welding and speed up the structural forming process.

Specialized tools and high-efficiency equipment: for special parts of movable bridges (such as large pivots, Develop and apply special installation and positioning tools, and equip with ultra-large tonnage and high-precision lifting and pushing equipment to ensure one-time lifting/installation and reduce commissioning time.

3. Lean Project Management and Seamless Collaboration (Opening the Fast Track to Delivery):

Lean Construction Plan: Using lean construction concepts such as critical path method and Kanban management, formulate highly optimized and dynamically adjusted construction plans, coordinating resources to the hour level.

Efficient integration of the supply chain: Establish strategic cooperation with high-quality material suppliers and logistics partners to ensure the on-time delivery of prefabricated components and key equipment, and eliminate stoppages caused by waiting for materials.

Experienced rapid rail construction team: Form a "rapid response force" composed of senior project managers, construction engineers and skilled workers. It has a lot of practical experience in successfully implementing "short construction period, high difficulty" activity bridge projects and is familiar with how to avoid delays.

Parallel engineering and efficient communication: The stages of design, procurement, factory prefabrication, site preparation, transportation, and installation and commissioning are highly parallel operations, and the information of all parties is shared in real time and decisions are made efficiently through digital platforms.

4. Strictly control the debugging and acceptance process (ensure success in one go):

Factory pre-commissioning: Complete the partial commissioning and pre-commissioning of mechanical, hydraulic, and electrical systems in the factory as much as possible, greatly reducing the complexity and time of on-site commissioning.

Standardized debugging process: use proven, efficient debugging procedures and advanced testing equipment to quickly locate and solve problems.

Digital delivery to facilitate acceptance: use BIM models and construction process data to provide owners with clear and complete completion information, and accelerate the acceptance process.

In the era of pursuing speed, we are not only the builders of steel structure movable bridges, but also the providers of efficient delivery solutions. We constantly challenge the limits of engineering efficiency with innovative processes, precise organization, and strong execution, turning "impossible" project timelines into reality. Choosing us means choosing the perfect combination of speed, reliability, and excellence.

Content Menu
We provide a well developed one-stop service system to meet customers' needs in procurement, logistics, technical support and more.

CONTACT US

Phone:+86-177-1791-8217
Email: greatwallgroup@foxmail.com
WhatsApp:+86-177-1791-8217
Add:10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China

QUICK LINKS

PRODUCTS CATEGORY

KEEP IN TOUCH WITH US
Copyright © 2024 Evercross bridge.All Rights Reserved.