factory
 
 
PROVIDE PROFESSIONAL STEEL BRIDGE SOLUTIONS
We are an Integrated enterprise of industry and trade
You are here: Home » News » Design Intelligence - The Golden Intersection of Academia And Industry

Design Intelligence - The Golden Intersection of Academia And Industry

Views: 200     Author: Site Editor     Publish Time: 2025-06-22      Origin: Site

Inquire

wechat sharing button
line sharing button
twitter sharing button
facebook sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Design Intelligence - The Golden Intersection of Academia and Industry

Content Menu

Against the backdrop of increasingly complex global infrastructure construction and stringent environmental requirements, bridge engineering is transitioning from traditional "structure-heavy" approaches to "intelligence-heavy" paradigms. Great Wall Heavy Industry, as a leading enterprise in China's steel structure bridge sector, has adopted "intelligent design and manufacturing" as its core philosophy. By integrating top-tier academic resources such as Tsinghua University's Bridge Research Institute and Politecnico di Milano's Structural Laboratory, we are building an innovation ecosystem that forms a golden triangle of industry, academia, and research. We infuse industrial products with academic wisdom and endow bridges with life through digital technologies, committed to providing global clients with landmark steel structure bridge solutions that combine aesthetics with absolute reliability.

1. The Golden Intersection of Academia and Industry: Constructing the Industry-University-Research Golden Triangle

Great Wall Heavy Industries fully recognizes that true innovation does not stem from breakthroughs in a single dimension, but rather from the deep integration of academic research and industrial practice. To this end, we have established long-term collaborative partnerships with Tsinghua University's Bridge Engineering Research Institute and the Structural Laboratory of Politecnico di Milano to jointly advance cutting-edge developments in the design and manufacturing of steel structure bridges. This industry-academia-research golden triangle model not only enhances our technical capabilities but also enables us to respond more precisely to the unique demands of different regions worldwide.

With the support of the Tsinghua University Bridge Research Institute, we have a professional design team led by renowned professors from both domestic and international backgrounds. They not only possess profound theoretical expertise but also have accumulated extensive practical experience in real-world engineering projects. We employ internationally leading steel bridge design software to ensure the scientific rigor and forward-thinking nature of our design process. At the same time, we strictly adhere to international standards such as the American AISC, British BS5400, and Australian AS5100, providing solid technical assurance for bridge design.

With the support of the structural laboratory at Politecnico di Milano, we have introduced advanced structural analysis and simulation technologies to ensure the stability and safety of bridges in complex environments. We particularly focus on extreme working conditions such as the corrosive coastal environment in Australia, century-long fatigue loads in Europe, and seismic requirements in the United States. Through parametric modeling and digital twin technology, we achieve intelligent and precise bridge design. Our modular design for steel bridges not only enhances construction efficiency but also significantly reduces maintenance costs, providing global clients with more efficient and sustainable solutions.

2.  Digital Twin Technology: Intelligent Management Throughout the Entire Lifecycle of Bridges

Amidst the current wave of digital transformation, digital twin technology is emerging as a key driving force in the field of bridge engineering. Great Wall Heavy Industry has leveraged its proprietary BIM collaborative platform to develop a digital twin-based bridge lifecycle management system. This system not only achieves seamless integration of bridge design, construction, and operation and maintenance but also provides a scientific foundation for bridge health monitoring and intelligent maintenance through real-time data collection and analysis.

The core of digital twin technology lies in "virtual-real mapping," which involves synchronizing the operational status of physical bridges with digital models through high-precision 3D modeling. This technology not only enables the pre-simulation of a bridge's full lifecycle maintenance but also identifies potential issues during the design phase, thereby optimizing the design and reducing rework later. For instance, in the corrosive coastal environment of Australia, digital twin models can simulate corrosion rates under various climatic conditions, allowing for the early formulation of anti-corrosion strategies to ensure the long-term durability of the bridge.

Under the challenge of century-long fatigue loads in Europe, digital twin technology can monitor the stress distribution and fatigue damage of bridges in real time, providing data support for bridge maintenance and reinforcement. Against the backdrop of increasingly stringent seismic requirements in the United States, digital twin technology can simulate the impact of seismic waves on bridges, optimize structural design, and enhance the seismic performance of bridges.

3.  Materials and Technology: The Cornerstone of Building World-Class Bridges

Great Wall Heavy Industry has always adhered to the philosophy that "materials are life." All raw materials are sourced from large international steel mills such as Bilei, ensuring compliance with international standards including European EN10025, American ASTM, and Australian AS/NZS. Our welding processes conform to AWSD1.5 (the highest welding standard globally) and EN1090 CE-DoP, guaranteeing that the welding quality reaches internationally leading levels. This relentless pursuit of material and process excellence provides a solid safety foundation for our bridges.

4.  Looking Ahead: Leading Global Bridge Construction Through Innovation

Against the backdrop of continuously upgrading global infrastructure construction, Changcheng Heavy Industry will further deepen industry-academia-research collaboration to promote the intelligent and digital development of steel bridge design and manufacturing. We firmly believe that through the deep integration of academia and industry, the extensive application of digital technologies, and the relentless pursuit of material and process excellence, we can provide global clients with safer, more reliable, and smarter bridge solutions.

In the future, Great Wall Heavy Industry will continue to uphold "intelligent design and manufacturing" as its core philosophy, guided by academia, driven by digitalization, and powered by innovation, to build a world-class steel structure bridge brand, infusing global bridge construction with Chinese wisdom and strength.  


Content Menu
We provide a well developed one-stop service system to meet customers' needs in procurement, logistics, technical support and more.

CONTACT US

Phone:+86-177-1791-8217
Email: greatwallgroup@foxmail.com
WhatsApp:+86-177-1791-8217
Add:10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China

QUICK LINKS

PRODUCTS CATEGORY

KEEP IN TOUCH WITH US
Copyright © 2024 Evercross bridge.All Rights Reserved.